MOI quick-look status report:
Flight software: nominal, no constraints for going to high-rate, 20% utilization
Propulsion: nominal, 1610 second burn, 244 PSI, no valve leakage, no constraints
ACS: At Earth-point on reaction wheels, star tracker acquisition, Sun on sun sensor, 1641 second burn, 1000.5 m/second delta-V close to expected, wheel speeds very low, no constraints.
Thermal: temps good, set a few alarms, no issues for high-rate
APS: nominal, trickle-charging batteries, batteries at 110% going up to 118%. 870 watts of power, 50% utilization of solar arrays, all temps nominal, no constraints.
C&DH: nominal
Telecom: nominal, all on primary equipment, signal levels as expected, got a successful command in
Fault protection: No abnormal fault protection timeouts, no constraints
__________________
Everything I need to know I learned through Googling.
|