Meh, donno. They've got to get the line repaired, maybe by the end of the week. According to one article, they were wanting to get it on the grid by the end of last week. I'd have thought start-up testing would take longer than that.
Ah, the NRC reactor status report says that BFN U1 is at 9% power. They've gotten it fixed. So ramp-up will take today and maybe gen-sync tonight or tomorrow.
|